Roadworks are under way on one of North Lincolnshire's most-used roads.Northern Powergrid is tackling a cable fault alongside the carriageway, and warning signs are in place.The works on the outskirts of Brigg are scheduled to continue until December 8.Repairs are being carried out either side of the mini-roundabout at Scawby Brook, where the B1206 meets the A18.
↧