A SCUNTHORPE firm is beginning to see the benefit of a £100,000 investment in solar energy.Steel fabricator and processor SC4 (UK) Ltd, based on Midland Road, had a 90kw photo-voltaic installation placed on its warehouse roof earlier this year. The 360 panels are routed through three inverters to give a maximum power output of 90kw.The project was specified, sourced and managed by Brigg-based Lincs Eco Energy.Karen Eddy, a director at SC4, said: "We have had some good days...
↧